Product team testing a smart-speaker-style device with microphones in an anechoic chamber

Cyber Resilience Act

EU CRA conformity assessment modules: how to choose one

Last updated:

Choosing a conformity assessment module under the Cyber Resilience Act is a two-step decision, not a single choice: first your product's Annex III/IV classification fixes which of Article 32's four routes — Module A self-assessment, Modules B+C, Module H, or a certification scheme — are even legally available, and only then, among whichever routes remain open, do cost, lead time, standards coverage and market expectations decide which one actually makes sense to use.

Getting the first step wrong means picking a route the regulation does not let you use; getting the second step wrong means paying for third-party assessment you did not need, or self-assessing on a product too complex to defend that choice later.

Article and annex numbers below were checked on 13 November 2026 against the Official Journal text of Regulation (EU) 2024/2847 and the Commission's CRA conformity assessment page. Classification itself is covered in CRA Annex III/IV classification. This is general information, not legal advice.

Key takeaways

  • Article and annex numbers below were checked on 13 November 2026 against the Official Journal text of Regulation (EU) 2024/2847 and the Commission's CRA conformity assessment page.
  • Module A — internal control.
  • Annex VIII sets out each procedure.
  • You cannot choose a module before you know your product's tier.

What are the CRA's conformity assessment modules?

Article 32 names up to four procedures a manufacturer can use to demonstrate that a product with digital elements meets the Annex I essential cybersecurity requirements before it goes on the market:

  • Module A — internal control. The manufacturer assesses its own product, compiles the technical documentation, and signs the EU declaration of conformity. No notified body is involved.
  • Modules B + C, together. A notified body examines a representative sample of the product under Module B (EU-type examination); the manufacturer then has to manufacture every unit to match that approved type under Module C. The CRA pairs these two modules rather than offering Module B alone.
  • Module H — full quality assurance. A notified body audits the manufacturer's quality management system itself, rather than a product sample, to confirm the system reliably produces conforming products.
  • A European cybersecurity certification scheme, where the Commission has adopted one under the Cybersecurity Act (Regulation (EU) 2019/881) and made it relevant to the product category — the EUCC scheme is the first such scheme to exist, though it predates and was not built specifically for the CRA.

This guide focuses on how to pick among these once you know which ones apply to you; for the detail of where the module text sits in the regulation's annexes and the open-source self-assessment carve-out, see CRA conformity assessment: self-assessment vs notified body.

What does each module ask of the manufacturer and the notified body?

Annex VIII sets out each procedure. The differences that matter for planning:

Module A (Part I) Modules B + C (Parts II and III) Module H (Part IV)
Who assesses The manufacturer, on its sole responsibility A notified body examines the technical documentation, supporting evidence and specimens of one or more critical parts; the manufacturer then keeps production in line with the approved type A notified body audits the quality system for design, development, final inspection and testing, and vulnerability handling, with a visit to the premises where they exist
What the notified body issues Nothing EU-type examination certificate, possibly with conditions Quality system approval decision
After approval — Periodic audits of the vulnerability handling processes; changes to the type or those processes that may affect conformity need an addition to the certificate Periodic audits of the quality system; intended changes go to the notified body first
Marking CE marking CE marking CE marking plus the notified body's identification number
Records kept 10 years or the support period, if longer Technical documentation and EU declaration of conformity The same, plus the certificate and its additions The same, plus quality-system documentation and the notified body's decisions and reports

The CRA-specific point is vulnerability handling. Under modules B and H the notified body examines the Annex I Part II processes, not only the product design, and keeps auditing them, so your PSIRT and reporting process is part of the audit scope. Module H also suits makers with many models: the application covers the technical documentation of one model per product category (Part IV point 3.1(b)).

Which modules are open to you, and why does classification decide first?

You cannot choose a module before you know your product's tier. Annex III and IV sort products with digital elements into three tiers, and each tier opens a different subset of Article 32's routes:

Tier Example products Modules actually open to you
Default (not in Annex III or IV) Most products with digital elements All four: Module A, Modules B+C, Module H, or a certification scheme — your choice
Annex III important, Class I Browsers, password managers, VPN products, routers/modems/switches, smart home security devices Module A only if harmonised standards, common specifications, or a "substantial"-level certification scheme already fully cover the relevant requirements; otherwise Modules B+C or Module H
Annex III important, Class II Hypervisors, firewalls/IDS/IPS, tamper-resistant microprocessors and microcontrollers Modules B+C, Module H, or a certification scheme at "substantial"; self-assessment only for free and open-source software that publishes its technical documentation (Article 32(5))
Annex IV critical Hardware security modules, smart meter gateways, smartcards and secure elements A European cybersecurity certification scheme where the Commission requires one; otherwise the Class II third-party procedures

A default-tier product is the one case where "choosing a module" is a genuinely free decision among all four routes. Everywhere else, classification narrows the menu before cost or preference enters into it. For Annex IV, no delegated act under Article 8(1) requiring certification had been published in the Official Journal when we checked on 13 November 2026, so critical products follow the class II procedures (Article 8(1), last subparagraph).

Does integrating a listed component change the route?

No. The core functionality of the product as a whole decides its class, and with it the route (Implementing Regulation (EU) 2025/2392, recitals 2 to 4). The Commission's CRA guidance of 27 July 2026 (section 6.2) adds two rules for class I:

  • Full application, full core coverage. To use module A, the manufacturer must apply all applicable requirements of a relevant harmonised standard, and that standard's scope must cover at least all the risks of the product's core functionality.
  • Extra functions need their own treatment. Functions outside the standard's scope do not block module A, but their risks must be treated and documented by other means, and presumption of conformity covers only what the standard covers (section 6.3).

The guidance's example 63 is a router with an integrated firewall component: it stays a class I router, the manufacturer applies the router standard plus extra measures for the firewall function, and may use module A for the whole product. Likewise, a class I product that integrates a secure element stays in the class I regime.

How do you choose if more than one route is open to you?

Only default products and some Class I products actually face a choice. When they do, four factors decide it in practice:

  1. Standards coverage, for Class IIf a harmonised standard, common specification, or "substantial" certification scheme does not fully cover your product's relevant requirements, Module A is not legally available to you — check where the CRA's harmonised standards actually stand before assuming self-assessment is on the table.
  2. Notified-body lead time against your ship dateModules B+C and Module H both run through a notified body, and capacity is a real planning constraint. A product aimed at the CRA's 11 December 2027 application date, or at an earlier voluntary launch, needs that conversation started months ahead, not after the technical documentation is otherwise finished.
  3. Cost and audit burden versus liabilityModule A costs less and avoids a notified-body audit cycle, but the manufacturer alone carries the compliance risk if a market surveillance authority later disagrees with the self-assessment. Modules B+C and Module H cost more and take longer but transfer part of that scrutiny to an independent body before the product ships.
  4. What the market actually expectsA default-tier product sold into a sector that already expects third-party assurance — for example alongside IEC 62443-4-2-assessed industrial components — can still legally self-assess under Module A, but a manufacturer may reasonably choose Modules B+C, Module H, or a certification scheme anyway to match what buyers in that market are used to seeing.

None of these factors changes which modules the regulation permits — only which of the permitted ones is the sensible pick.

Where do harmonised standards and certification schemes stand?

Module A eligibility for Annex III Class I products turns on "fully applying harmonised standards, common specifications, or a certification scheme at assurance level at least 'substantial'". As of 13 November 2026, none of the three existed in usable form:

  • Harmonised standards. No CRA harmonised standard had been cited in the Official Journal, the one event Article 27 says creates presumption of conformity. On 10 November 2026 the Commission amended standardisation request M/606 to give three more months for all vertical and some horizontal standards (CRA standardisation page).
  • Common specifications. Article 27(2) allows them only as a fallback when standards fail; none had been adopted.
  • Certification schemes. EUCC exists under the Cybersecurity Act, but it counts as a CRA route only once the Commission specifies it by delegated act under Article 27(9); its conformity assessment page says those conditions "need to be specified".

A Class I manufacturer counting on module A needs to track the Official Journal citation date directly, not assume a CENELEC-approved draft already qualifies.

How does SBOM and firmware evidence support the technical documentation, whichever module you choose?

Picking a module decides who assesses your product; it does not change what has to be in the Annex VII technical documentation underneath that assessment. Every route — Module A, Modules B+C, Module H, or a certification scheme — rests on the same underlying evidence:

  • A software bill of materials. Annex I Part II point (1) requires an SBOM in a commonly used, machine-readable format covering at least top-level dependencies. See firmware SBOM without source code for how to build one from a binary image when the original build environment is not available.
  • A record that known exploitable vulnerabilities were checked and handled. Annex I Part I point (2)(a) and the vulnerability-handling obligations in Annex I Part II both expect this, and it is part of what a notified body reviews under Modules B+C or H, or what a manufacturer has to be able to defend under Module A.

An engineer-reviewed firmware and SBOM scan produces this evidence faster than manual component research. It does not decide which Article 32 module applies, and under Article 27 it does not create presumption of conformity — only a cited harmonised standard, a common specification or a certification scheme specified under Article 27(9) does that. A scan report is evidence the manufacturer still has to review and stand behind, not a conformity assessment.

Who are CRA notified bodies, and how do you find one?

Notified bodies are conformity assessment bodies that a Member State has assessed, designated and notified to the Commission; the CRA rules for that (Chapter IV, Articles 35 to 51) have applied since 11 June 2026. Notified bodies and notifying authorities are listed in the Commission's NANDO database in the Single Market Compliance Space. ENISA published technical competence requirements for CRA notified bodies on 4 June 2026.

Three practical points from the Regulation: a module B application goes to a single notified body of your choice, with a written declaration that no other body has it (Annex VIII Part II point 3); fees must be reduced proportionately for micro, small and medium-sized enterprises (Article 32(6)); and Member States should support small companies with training, an advice channel and testing support (Article 33).

Worked example: which routes does a smart-lock maker have?

Synthetic example for illustration; the company and products are invented. A maker sells three products in the EU from 2028:

Product Class (core functionality) Routes open Choice in this example
Smart door lock with a secure element Annex III class I, smart home product with security functionality; the secure element does not make it critical Module A only with a cited standard applied in full; otherwise B+C or H Book B+C now; switch to A if a standard covering the lock's core risks is cited in time
Hub that centrally controls the locks Annex III class I (2025/2392 includes hardware that centrally controls such products) Same as the lock Same notified body, separate type examination
Wi-Fi smart plug Default, if the risk assessment confirms no listed core functionality All four Module A

With more lock models expected, module H becomes worth pricing: one quality system approval can cover the category, instead of a type examination per model.

Which mistakes push a product onto the wrong route?

  • Classifying by components instead of the product's core functionality.
  • Counting a draft standard as applied: only an Official Journal citation counts for class I module A.
  • Applying a standard that covers only part of the core-functionality risks and still self-assessing.
  • Treating EUCC as a CRA route before a delegated act under Article 27(9) exists.
  • Changing the update mechanism or vulnerability process after a type examination without telling the notified body (Annex VIII Part II point 7).
  • Booking a notified body late: the certificate is needed before the first unit is placed on the market from 11 December 2027.

Where should you start?

  1. List the modules your classification opens up, using the table above.
  2. If a notified body is needed, start the conversation earlyLead time, not paperwork, is usually the real constraint.
  3. Build the SBOM and vulnerability evidence regardless of moduleA firmware SBOM built now does not have to be redone once a module is chosen.
  4. Revisit the choice if the Commission amends Annex III/IVor a harmonised standard is cited in the Official Journal.

SoftWSP's firmware security work builds the SBOM and vulnerability evidence that feeds a CRA technical documentation file: see device & firmware security services. For the underlying requirements any module has to demonstrate, see the CRA checklist for device makers.

This guide summarises Regulation (EU) 2024/2847 and the Commission's guidance; it is not legal advice, and a conformity assessment decision should rest on the current official text.

Put this guide to work

Frequently asked questions

What are the CRA's conformity assessment modules?

Article 32 of Regulation (EU) 2024/2847 gives manufacturers up to four conformity assessment routes, per corroborated secondary legal analysis: Module A (internal control — self-assessment, no notified body), Modules B+C together (a notified body's EU-type examination plus the manufacturer's own internal production control), Module H (full quality assurance, where a notified body assesses the manufacturer's quality management system rather than a product sample), and a European cybersecurity certification scheme, where one has been adopted under the Cybersecurity Act and the Commission has made it relevant to the product category.

How do I know which modules are actually open to my product?

Your product's classification decides this before you choose anything. A default product (not listed in Annex III or IV) can use any of the four routes. An Annex III important Class I product (browsers, password managers, VPN products, routers/modems/switches, smart home security devices, and more) can self-assess only if harmonised standards, common specifications, or a certification scheme at assurance level at least 'substantial' fully cover the relevant requirements; otherwise it needs a notified body. Annex III Class II products (hypervisors, firewalls/IDS/IPS, tamper-resistant microprocessors and microcontrollers) and Annex IV critical products (hardware security modules, smart meter gateways, smartcards and secure elements) cannot self-assess, except free and open-source software in Annex III whose technical documentation is made public (Article 32(5)).

If more than one module is open to my product, how should I choose?

Weigh four things: whether harmonised standards or a certification scheme already cover your product closely enough to make self-assessment safe to rely on; notified-body lead time against your own ship date and the CRA's 11 December 2027 application deadline; the cost and audit burden of Modules B+C or H against Module A's lower cost but full manufacturer liability; and whether a stronger third-party signal helps you sell into a market or sector that expects one, even where self-assessment would legally be enough.

Does an SBOM or firmware analysis decide which conformity assessment module I need?

No. Your product's Annex III/IV classification decides which modules Article 32 makes available; an SBOM and a firmware vulnerability analysis do not change that. What they do is supply evidence — the software bill of materials Annex I Part II point (1) requires, and the vulnerability-handling record Annex I Part I point (2)(a) and Annex VII expect — that has to go into the technical documentation regardless of which module you end up using.

Can AI-assisted firmware or SBOM analysis replace a notified body or grant presumption of conformity?

No. Automated, engineer-reviewed firmware and SBOM analysis can generate technical-documentation evidence faster than manual component research, but it cannot stand in for a notified body's Module B+C type-examination or Module H quality-system audit, and under CRA Article 27 presumption of conformity comes only from a harmonised standard cited in the Official Journal, a common specification, or a certification scheme the Commission has specified by delegated act — a scan report, however it was produced, does not. The manufacturer or importer remains responsible for the conformity assessment itself.

Sources

  1. Regulation (EU) 2024/2847 (Cyber Resilience Act), Articles 27 and 32 and Annexes I, III, IV and VII, Official Journal text, EUR-Lex
  2. European Commission: Cyber Resilience Act, summary of the legal text
  3. European Commission, Digital Strategy: Cyber Resilience Act — Standardisation
  4. ENISA: Cybersecurity Certification Framework (Regulation (EU) 2019/881, assurance tiers, scheme list)
  5. Springlex: Cyber Resilience Act, Article 32 — Conformity assessment procedures for products with digital elements
  6. Acquislaw: Cyber Resilience Act, Article 32 — full text, verified
  7. Commission Implementing Regulation (EU) 2025/2392 on the technical description of the categories of important and critical products
  8. European Commission: Commission publishes new guidance to support timely Cyber Resilience Act implementation (27 July 2026, guidance C(2026) 5252, sections 6.2-6.3)
  9. European Commission: Cyber Resilience Act, Conformity assessment
  10. European Commission, Single Market Compliance Space: notified bodies (NANDO)
  11. ENISA: Technical Competence Requirements for CRA Notified Bodies (4 June 2026)
Was this guide helpful?

In this cluster

EU CRA conformity assessment modules: how to choose one