The 8 items below are drawn from Annex I of Regulation (EU) 2024/2847, the Cyber Resilience Act, whose obligations phase in on the timeline the European Commission's own CRA policy page sets out: reporting duties from 11 September 2026, full applicability from 11 December 2027. The 24-hour exploited-vulnerability item below is filed, once it applies, through ENISA's CRA Single Reporting Platform.
This self-check is informational only, not legal advice and not a certification. It covers only the items above, not the full Cyber Resilience Act. Your answers stay in your browser.
Why does the CRA treat a vulnerability disclosure channel as a legal requirement, not good practice?
Regulation (EU) 2024/2847, the Cyber Resilience Act sets out its vulnerability-handling obligations in Annex I as essential requirements a product must meet, not as voluntary good practice. That is why this checklist lists "a published vulnerability disclosure policy and security.txt file" as one of its 8 items alongside SBOM availability and secure default configuration — all 8 are drawn from that same Annex I essential-requirements list, per the European Commission's own summary of the Act.
The most time-sensitive consequence of that requirement shows up once the CRA's reporting duties start applying on 11 September 2026: a manufacturer that becomes aware a vulnerability is being actively exploited must notify within 24 hours, filed through ENISA's CRA Single Reporting Platform rather than each national authority separately. A disclosure channel that does not exist yet is the one gap on this checklist that cannot be fixed in a day once that clock starts.
Sources
Frequently asked questions
Is this self-check a CRA conformity assessment?
No. It is an informational, self-reported indicator against 8 Annex I-derived categories, not a conformity assessment, legal advice or a certification. A real conformity assessment follows the CRA's own procedure and, for important/critical products, may require a notified body.
What are the 8 items this check covers?
SBOM availability, secure default configuration, a field-update mechanism, a published vulnerability disclosure policy and security.txt file, a 24-hour exploited-vulnerability reporting process, a documented risk assessment, minimised attack surface, and a declared support period — each drawn from the CRA's Annex I essential requirements.
What is the 24-hour reporting obligation?
Under the Cyber Resilience Act, manufacturers must notify an actively exploited vulnerability or a severe incident within 24 hours of becoming aware of it. ENISA operates the CRA Single Reporting Platform manufacturers use to file that notification.
When do CRA obligations actually apply?
The regulation entered into force on 10 December 2024. Reporting obligations apply from 11 September 2026, and the regulation is fully applicable from 11 December 2027 — the dates the European Commission's own summary of the legislative text sets out.
Does the check save or send my answers anywhere?
No. Your checkbox answers stay in your browser for the session; nothing is uploaded. The "Download results" button writes a plain-text summary to a file on your own device.
Questions about this page?


